41 research outputs found

    The technical supervision interface

    Get PDF
    The Technical Control Room (TCR) is currently using 30 different applications for the remote supervision of the technical infrastructure at CERN. These applications have all been developed with the CERN made Uniform Man Machine Interface (UMMI) tools built in 1990. However, the visualization technology has evolved phenomenally since 1990, the Technical Data Server (TDS) has radically changed our control system architecture, and the standardization and the maintenance of the UMMI applications have become important issues as their number increases. The Technical Supervision Interface is intended to replace the UMMI and solve the above problems. Using a standard WWW-browser for the display, it will be inherently multi-platform and hence available for control room operators, equipment specialists and on-call personnel

    Is the CERN recommended SCADA useable for the ST division?

    Get PDF
    Supervisory Control and Data Acquisition (SCADA) systems are widely used at CERN and in industrial control environments. In order to limit the costs of purchase, maintenance and support, a recommendation for one SCADA system is in preparation by the SCADA working group. This SCADA system should be used for all CERN in-house developed applications as they exist today e.g. in the Technical Control Room (TCR). This presentation will show the actual environment for the control and monitoring of the technical infrastructure at CERN and the needs for the future LHC infrastructure monitoring. The presentation will cover the control activities of all ST groups represented in the ST Control System WG. A possible solution for the integration of the technical infrastructure data into a SCADA system and a solution for the data exchange with the accelerators and the experiments will be presented. This includes a short term planning for the evaluation period as well as the long-term strategy on how to implement the chosen solution

    TCR industrial system integration strategy

    Get PDF
    New turnkey data acquisition systems purchased from industry are being integrated into CERN's Technical Data Server. The short time available for system integration and the large amount of data per system require a standard and modular design. Four different integration layers have been defined in order to easily 'plug in' industrial systems. The first layer allows the integration of the equipment at the digital I/O port or fieldbus (Profibus-DP) level. A second layer permits the integration of PLCs (Siemens S5, S7 and Telemecanique); a third layer integrates equipment drivers. The fourth layer integrates turnkey mimic diagrams in the TCR operator console. The second and third layers use two new event-driven protocols based on TCP/IP. Using this structure, new systems are integrated in the data transmission chain, the layer at which they are integrated depending only on their integration capabilities

    CERN LHC Technical Infrastructure Monitoring (TIM)

    Get PDF
    The CERN Large Hadron Collider (LHC) will start to deliver particles to its experiments in the year 2005. However, all the primary services such as electricity, cooling, ventilation, safety systems and others such as vacuum and cryogenics will be commissioned gradually between 2001 and 2005. This technical infrastructure will be controlled using industrial control systems, which have either already been purchased from specialized companies or are currently being put together for tender. This paper discusses the overall architecture and interfaces that will be used by the CERN Technical Control Room (TCR) to monitor the technical services at CERN and those of the LHC and its experiments. The issue of coherently integrating existing and future control systems over a period of five years with constantly evolving technology is addressed. The paper also summarizes the functionality of all the tools needed by the control room such as alarm reporting, data logging systems, man machine interfaces and the console manager. Particular attention is paid to networking aspects, so that reliable and timely transmission of data can be assured. A pyramidal layered component architecture is compared with a complete SCADA solution

    FCC-ee: The Lepton Collider – Future Circular Collider Conceptual Design Report Volume 2

    Get PDF

    HE-LHC: The High-Energy Large Hadron Collider – Future Circular Collider Conceptual Design Report Volume 4

    Get PDF
    In response to the 2013 Update of the European Strategy for Particle Physics (EPPSU), the Future Circular Collider (FCC) study was launched as a world-wide international collaboration hosted by CERN. The FCC study covered an energy-frontier hadron collider (FCC-hh), a highest-luminosity high-energy lepton collider (FCC-ee), the corresponding 100 km tunnel infrastructure, as well as the physics opportunities of these two colliders, and a high-energy LHC, based on FCC-hh technology. This document constitutes the third volume of the FCC Conceptual Design Report, devoted to the hadron collider FCC-hh. It summarizes the FCC-hh physics discovery opportunities, presents the FCC-hh accelerator design, performance reach, and staged operation plan, discusses the underlying technologies, the civil engineering and technical infrastructure, and also sketches a possible implementation. Combining ingredients from the Large Hadron Collider (LHC), the high-luminosity LHC upgrade and adding novel technologies and approaches, the FCC-hh design aims at significantly extending the energy frontier to 100 TeV. Its unprecedented centre-of-mass collision energy will make the FCC-hh a unique instrument to explore physics beyond the Standard Model, offering great direct sensitivity to new physics and discoveries

    The Compact Linear Collider (CLIC) - 2018 Summary Report

    Get PDF